- Ankara
- System
- Active
Delivered on time.One-piece structure.
From institutional buildings to housing communities, we deliver on a double-panel structural system — on schedule, under single responsibility.
Afyonkarahisar Housing Project
Afyonkarahisar: secure housing community. Delivery target of 8 months from permit.
- Site
- 9.165 m²
- Floors
- Ground + 2 Floors
- Home Types
- 2+1 · 3+1
- Delivery Target
- 8 months from permit
§ 01Active Project

Concept image; layout and unit count are being finalised.
Afyonkarahisar Housing Project
Afyonkarahisar: a Ground + 2 Floors housing community. Delivery target of 8 months from permit.
2+1 · 3+1 | Interest-Free Payment After Handover | Notarised Contract
§ 02Approach
A building delivered late has failed, however well it was designed.
Antema Yapı is a contractor. Our work is not to be admired; it is to hand over the building we committed to, on the date we committed to, within the tolerance we committed to.
Because the panels are produced under controlled factory conditions, weather, labour fluctuation and on-site workmanship are taken off the critical path. There is one party accountable: us.
§ 03Structural System
Double-Panel (Shear Wall) Structural System
The space between the two panels is filled with concrete, and 35 mm of C40-class shotcrete is applied to both outer faces. The walls act as shear walls, and the building behaves as a single monolithic piece without columns or beams.
This section contains an interactive three-dimensional section. A static view is shown in line with your motion preference.

§ 04Comparison
A difference of method, not of material.
What follows is not about strength class or brand. It is about where a building is produced, under what conditions, and who answers for it.
Comparison
Conventional frame + infill
Antema Yapı (Double-Panel System)
- Production environment
- Conventional frame + infillProduction takes place on an open site.
- Antema Yapı (Double-Panel System)Panels are made in a factory; concrete is sprayed on site.
- Dimensional tolerance
- Conventional frame + infillDimensional tolerance depends on site workmanship.
- Antema Yapı (Double-Panel System)Panel dimensions are fixed in the factory, so less correction is needed on site.
- Programme risk
- Conventional frame + infillMost of the work happens on site, so the programme follows site conditions.
- Antema Yapı (Double-Panel System)Panel production runs independently of site work. What remains on site is assembly and shotcrete.
- Thermal continuity
- Conventional frame + infillInsulation is a separate work item.
- Antema Yapı (Double-Panel System)Insulation sits inside the wall section.
- Seismic behaviour
- Conventional frame + infillThe structural frame and the infill walls act as separate elements.
- Antema Yapı (Double-Panel System)The walls act together as shear walls; there are no columns or beams.
- Accountability
- Conventional frame + infillWork items may be carried out by separate subcontractors.
- Antema Yapı (Double-Panel System)One party, from production through assembly.
Concrete class: C40 shotcrete (40 MPa)
§ 05Capability
Six stages, from feasibility to handover.
Each stage produces the input for the next. The following stage does not begin until the previous one closes — that is where the programme comes from.
01 / 06
Feasibility and early assessment
Site, zoning and brief are tested against the system to establish suitability and a coarse cost range.
02 / 06
Structural design
Structural system, connection details and reinforcement layout are engineered and taken through approval.
03 / 06
Production planning
The panel schedule, production plan and delivery sequence are built around the assembly programme.
04 / 06
Panel production and quality control
Steel-mesh EPS panels are made in the factory. Dimensional checks are recorded for every batch.
05 / 06
On-site assembly and shotcrete
Panels are assembled on site, both faces are sprayed with shotcrete and the core is cast in place. Site time is assembly time.
06 / 06
Handover
Delivered with as-built documentation, inspection records and the scope of warranty.
Work we take on
- Residential
- Commercial
- Industrial
- Public
§ 06Briefing
Let us discuss your project.
If the site, programme and scale are known, the feasibility assessment can begin today.
Request a corporate briefing